Demolition and removal works at a LIDL store in Corfu. In the project, work was carried out on the removal of a false ceiling made of mineral fiber with an area of 1300m2, the removal of air ducts for fire safety pipes, the removal of lighting fixtures, the careful removal of a double-leaf door, the removal of insulation from columns, the cutting of the footing neck and the perimeter of the footing, and finally the cleaning of reinforced concrete. Finally, the area was cleaned, the bases were transported and removed.