Demolition and installation work at the headquarters of the AEGEAN airline, at the airport.
- ✓ Machine transfer from the room to the balcony on the 2nd floor
- ✓ Removal of aluminum partitions on the 2nd floor
- ✓ Removal of plaster wall in the warehouse
- ✓ Excavations in the outer space
- ✓ Paving outside the building